Confidential Location, UK
Our Role: We completed the outline design for a new Tier 4 facility. This was value-engineered to a Tier 3 facility, including 3MVA UPS data installation made up of 7 x %00kVA units arranged as N+1, together with duplicated circuits from the existing generator back mains supply.
The scheme also incorporated a mechanical services UPS installation comprising 3 x 300kVA units, again arranged for N+1 operation with the generator backed mains supply forming a duplicate supply.